Golden Hills Resource Conservation & Development |
PROUDLY SERVING WESTERN IOWA |
Home | About Golden Hills | Projects | Staff & Board | Building
The Problem
The Hungry Canyons Alliance (HCA) was formed locally to research and implement solutions to the problem of stream channel erosion and degradation in a 23 county area of the deep loess soils region of western Iowa. Channelization of streams and land use changes during the first half of the 1900’s caused stream channels to erode, causing an estimated $1.1 billion in damages to public and private infrastructure (bridges, culverts, utility lines, etc.), loss of farmland, and increased sediment loads. A survey of western Iowa bridges in 2000 revealed that 404 were endangered due to stream channel degradation. Golden Hills RC&D in Oakland, Iowa helped to form and currently provides office space and administrative assistance to the Hungry Canyons Alliance.
The Solution
Straightened versus meandering stream.
Bridge endangered by
An affordable solution to this problem is to build grade control structures in streams. Streambed stabilization is the key to preventing further erosion and protecting infrastructure. Grade control structures at regular intervals will help streams stabilize by changing their profile from an erosive steep incline to a stable stair-step pattern. Structures, which normally have a raised weir section and are constructed with steel sheet pile, riprap, and concrete grout, allow the stream elevation to drop in a controlled setting, while preventing further degradation, and create a calm backwater condition that allows silt to settle out upstream, decreasing sediment loads and turbidity, and increasing water quality.
Savings
HCA steel sheet pile weir with riprap
The HCA provides state and federal money available to the 23 counties through a cost share program for streambed stabilization structures. County governments provide a minimum of 20% match for each structure. Since 1992, the program has provided $20.5 million in state and federal appropriations and the technical assistance needed to complete 290 grade control structures in 17 counties in western Iowa. Another 29 structures are in progress. These structures will protect an estimated $77.75 million in property value. It is estimated that 570 acres of land, equivalent to 20.1 million tons of sediment, will be protected from erosion by construction of the 319 grade control structures. HCA streambed stabilization structures, with an average cost of $64,845, protect approximately $243,731 in property per structure. For every $1 invested in Hungry Canyons Alliance streambed stabilization structures, more than $4.24 of property value and an average of 0.98 tons of sediment are protected from streambed degradation. During FY 2008, 15 HCA structures were approved for cost share and construction was completed on another 13. A second HCA program provides funding to landowners where grade control is necessary to stabilize active gully erosion. This program is funded with the interest earned from state appropriations. This program has built 84, and approved another 9, structures for a total cost share of $619,406.
Left: A typical gully in western Iowa.
The following projects are examples of the type of assistance
2007-2008 Floods
Examples of damages caused during
Eighteen (18) western Iowa counties were declared eligible for federal disaster assistance due to severe rains in May 2007 and June 2008 which caused flooding and stream channel damage, endangering or destroying county infrastructure. This was the worst flood to hit western Iowa since 1993. The damage due to flooding was exacerbated by the highly erodible loess soils found throughout the counties.
Examples of damages caused during
The Hungry Canyons Alliance (HCA) was asked by its member counties to help lobby to secure EWP funding for their flood damages. The sole purpose of the HCA is to mitigate the effects of stream channel degradation on infrastructure and farmland, and EWP funding would complement the HCA’s mission without duplicating it. So in April 2008, representatives from the HCA made their annual trip to Washington D.C. to request federal funding for the HCA, but this year also did some lobbying with Iowa’s federal legislators on behalf of the NRCS-EWP program.
Knickpoint Migration StudyAerial stream video was used to find the locations of actively eroding stream knickpoints, some of which are being monitored closely as part of a research project to measure knickpoint propagation rates in the field. The overall goal of the proposed research is (1) to examine the morphodynamics of actively migrating knickpoints for different flow conditions, and (2) to develop a knickpoint erosion model that is applicable to the deep loess area of western Iowa. An accurate knickpoint erosion model for loess will aid in the placement of future HCA grade control projects. The project will be conducted by the University of Iowa’s IIHR–Hydroscience and Engineering Department and will be financed with HCA state funds (20%) and by the Iowa DOT Highway Research Board (80%).
Left: Knickpoint downstream from a sheet pile weir with a 20:1 riprap slope on Walnut Creek in Montgomery County.
![]()
Using Scrap Tires in Grade Control Structures
Top: First scrap tire project near Griswold.
The HCA has built two experimental grade control structures with scrap tires. Scrap tires are difficult to recycle and often reduce landfill capacity. The first phase of this project involved theoretical and experimental research done by Iowa State University. The second phase was construction of the prototype structures with the help of the NRCS and landowners. Scrap tires were arranged in layers, bolted together with lag screws, and filled with flowable concrete grout. The third phase of this project was the creation of a design manual which described construction technique and evaluated its cost, effectiveness, and structural stability compared to traditional grade control structure designs and materials. It has been distributed to county engineers and NRCS offices in western Iowa so similar structures may be built. The information learned will make any future scrap tire structure designs more cost effective.
Controlling Erosion While Allowing Fish Migration
Crawford County sheet pile weir with
The HCA has been working with the Iowa Department of Natural Resources (DNR) to design and construct weirs that will allow fish to migrate upstream. First, the DNR and HCA had a series of meetings to determine which streams were priorities for fish, such as catfish, to be able to migrate up and down. Second, the DNR and HCA agreed on a design that would allow fish migration. The design, exemplified by this structure (shown at right), consisted of a 20:1, horizontal-to-vertical, grouted rock slope downstream from a V-notch sheet pile weir. The two photographs below show a new weir design developed by the Page County Engineer. Fish are allowed to migrate over the structure by swimming up a gentle slope in the center of the structure through a series of alternating steel baffles that decrease water velocities and allow the fish to rest behind the baffles, while the structure still protects the bridge by providing grade control.
Page County sheet pile weir w/ fish baffles highlighted on an HCA tour. The HCA and DNR continued to cooperate on a couple research projects to find the most cost effective structures that allow fish migration. The first study involved modifying two weirs in Cass County on Turkey Creek to a 15:1 downstream slope. Before and after the modifications, the DNR and the Natural Resource Ecology and Management Department at Iowa State University caught, tagged, and released fish from above and below the weirs. The major results of this study were: 1) catfish were documented moving over the 15:1 weirs, 2) fish communities were slightly better (5%) near the weirs compared with reaches without weirs, and 3) macroinvertebrate abundance and diversity was 60% greater near the weirs compared to reaches without weirs. This study was funded with HCA state funding (17%) in partnership with the US Geological Survey (22%), US Fish and Wildlife Service (15%), Iowa State University (35%), and the Iowa Department of Natural Resources Fisheries Bureau (11%).
University of Iowa students readying
Iowa State University students and
The second study, performed by the University of Iowa’s IIHR–Hydroscience and Engineering Department, measured velocities on different weir backslopes and performed modeling of different structure slopes to optimize for channel catfish migration while reducing flow velocities, slope lengths, and costs. There were two major results of this study. First, without considering drainage area, low gradient (20:1, 22:1, 25:1) grouted or riprap weirs and fish ladders performed the best. The medium gradient (12:1, 14:1, 16:1) weirs also performed satisfactorily. Second, when considering drainage area, it is recommended that when the drainage area is less than 20 mi2, the best structure is a low gradient weir because the variable controlling fish passage is the flow depth; when the drainage area is between 20 and 100 mi2, the best structure is either a low or medium gradient weir because the variable controlling fish passage is either the flow depth or maximum velocity; when the drainage area is larger than 100 mi2, the best structure is a medium gradient weir because the variable controlling fish passage is maximum velocity. This study was funded with HCA state funding (25%) in partnership with the DNR (25%) and the Iowa DOT Highway Research Board (50%). The DNR stream classification design criteria was changed to using a 15:1, horizontal to vertical, grouted rock slope, instead of a 20:1 (more expensive) slope, because of these two research projects.
Experimental Bored Headcut Basin Projects
Top: The headcut was located at the second
Some gullies in the deep loess soils of western Iowa, especially in the loess hills region, can be very deep, reaching depths of approximately 70 feet, with near-vertical headcuts and side walls. The reason for this is that primary deposits of loess soil are highly erodible and unstable when wet, but unlike other types of sediment deposits, they are very stable when vertical and dry. Gullies expand and erode upstream during rain events due to surface runoff, entering the gully via the headcut, and due to groundwater flow, entering the gully at the base of near-vertical walls, both of which de-stabilize the gully walls causing bank collapse. Runoff then carries away the collapsed bank debris, preparing the walls again for collapse. Stabilization or control techniques are limited to pipe-drop structures, but associated fill of the gully and excavation of a core trench in an area of such high relief makes these types of structures often cost-prohibitive, and definitely not cost-effective. However, the only way to stop the cycle of gully erosion is to pass as much runoff, as quickly as possible, to the base of the gully by pipe. The HCA project director proposed the idea of using directional drilling techniques to bore a hole at an angle through the primary loess soil from upstream of the headcut to the base of the gully wall. A plastic PVC pipe would be inserted into the borehole and the bentonite slurry, used to drill the hole, would also act as the sealant that would make the borehole watertight as it dried. A vertical PVC riser would be added to the angled pipe to serve as an inlet. A water-retention basin would be excavated upstream of the inlet, and a terrace would be built downstream of the inlet, between the inlet and the headcut. The basin allows a larger storm event to be controlled by a smaller pipe. No work is done in the gully and there is no filling of the gully, dramatically reducing earthwork costs. The near-vertical gully headcut will gradually slump to a stable slope over time because collapsed debris will not be carried away by runoff.
Left: Directional drilling machine boring hole.
The HCA has built three of these experimental Bored Headcut Basin (BHB) structures to control three 30-40-foot deep gully headcuts with small drainage areas (< 17 acres) in the deeply incised small watersheds of the Loess Hills. Non-terraced sites were chosen to limit the amount of infiltration occurring upstream of the BHB’s. Survey and design assistance was provided by the USDA-NRCS. The three experimental BHB’s completed have averaged only $10,560 and have weathered >3 inch rain events without problem. Considering a typical pipe drop structure may have cost as much as $60,000, the BHBT has proven to be very cost-effective. We are continuing to monitor its progress, while planning for future more BHB projects.
Endangered Pipeline Structure Protected
Stage-Discharge ProjectThere are no gaged (measures water discharge) medium to small sized (less than or equal to 100 square mile drainage area) streams in western Iowa, which limits our ability to predict erosion. To remedy this, a semi-automatic, permanent, sensor network is being installed on 11 representative, ungaged streams in the deep loess area of Western Iowa. Stage-discharge relationships for these streams will be developed. The project will be conducted by the University of Iowa’s IIHR–Hydroscience and Engineering Department, the HCA, and possibly the U.S. Geological Survey, and it will be financed with HCA state funds (39%) in partnership with the Iowa DOT Highway Research Board (61%).
Addition of Guthrie County to the HCADuring the summer of 2007, the Iowa State Legislature approved the HCA’s and Guthrie County’s requests to make Guthrie County eligible for membership in the Hungry Canyons Alliance. Guthrie County has land that drains to the Missouri River, has areas that have deep loess soils greater than 20 feet in depth, has areas that have been identified by the Iowa DNR and US EPA as an ecological subregion with surficial deposits just like those of other HCA counties, and is currently experiencing active streambed degradation, especially in the northwest corner of the county in the Brushy Creek watershed. The geologic and hydrologic data we have now is better than it was when the HCA was initially formed; had this information been available in the early 90’s, Guthrie County would have been included in the HCA. Guthrie County has since joined the HCA as a dues paying member.
Future of the Hungry Canyons Alliance
This stream has downcut enough
The Hungry Canyons Alliance will continue to provide the people of western Iowa with technical assistance and cost share for grade control structures as long as the need for stream erosion control exists and we receive appropriations from our state and federal legislators. Eastern Nebraska also has streams that have been channelized in areas of deep loess soils. These streams have responded in the same manner as western Iowa streams that were channelized; they are actively downcutting, which has caused damages to public and private infrastructure (bridges, culverts, utility lines, etc.), loss of farmland, and increased sediment loads. However, unlike Iowa, nothing has ever been done at the federal or state level to prevent streambed degradation in eastern Nebraska. Because of this, the HCA has been asked to provide guidance to several parties in eastern Nebraska that are concerned about downcutting streams and who are trying to organize a group similar to the HCA to provide cost share for grade control projects in eastern Nebraska.
Left: Degradation on this stream has caused the near-vertical actively-eroding streambanks in Nebraska.
|
|
||||||
|
|||||||